Demo update

 

IMG_3161

IMG_3168

Lot got done today. All trees etc on left side are down and hauled away.

IMG_3171

This pile of rubble was hauled this afternoon.

IMG_3173Working on removing the last piece of the Omni roof overhang.

IMG_3176The Omni wall is totally exposed and connecting overhang is gone.

IMG_3379

The President inspected the job and had a tour by contractor.

IMG_3386

Roof removal complete and covered.

IMG_3387

The rubble has been cleared from the connecting slab.

IMG_3387

The slab will be jack hammered and expose the water line in the AM. Omni will then cap and run the new lines. This is totally coordinated with Omni. Then the wall is their issue.
We will then complete the demo/haul away.
All is still on schedule. No rain till Saturday.