GREAT WEATHER FOR WORKING ON THE EXTERIOR

THE FRONT ENTRY IS ALMOST COMPLETE – JUST THE INSIDE TRIM IS NEEDED

THE MAIN ROOM AWAITS WINDOW TRIM, CEILING TILES, AND A SECOND COAT OF PAINT

ANOTHER SPACE ALMOST COMPLETE

BAR AREA NEEDS A LOT OF WORK

WORK ON THE DECK WALL HAS STARTED

WORK ON THE DRAINAGE SYSTEM HAS STARTED

THE UPPER LEVEL HAS THE FINAL COLORS

THE FRONT SIDING IS ALMOST COMPLETE

THE METAL ROOF IS COMPLETE

FRAMING FOR THE SCREEN PORCH HAS STARTED