OCTOBER 19 UPDATE

A LOT HAS HAPPENED THIS WEEK.

THE FRONT ENTRANCE IS COMPLETE. THE RAMP AND STEPS WILL BE FINISHED NEXT WEEK.

ALL MATERIAL IS BEING REMOVED FROM THE PARKING LOT SO MILLING AND REPAVING CAN BE COMPLETED IN THE NEXT COUPLE OF WEEKS. THIS IS WEATHER AND CONTRACTOR DEPENDENT, BUT WE WILL BE READY

IRRIGATION WORK HAS STARTED IN PREPARATION FOR LANDSCAPING

FINAL OUTSIDE TRIM IS BEING COMPLETED AND PAINTING WILL CONTINUE ON THE FIRST LEVEL

INSIDE FLOOR TILE IS PROGRESSING. THIS IS A VERY SLOW PROCESS BUT WILL BE BEAUTIFUL. THIS IS THE SOUTH VIEW LOOKING OUT ON THE DECK

THAT’S THE FIREPLACE ON THE LEFT – THREE SIDED. LARRY YOU WILL LOVE IT

THE LOUNGE IS ALSO PROGRESSING. THE BIFOLD PANELS AND BAR AREA WILL BE COMPLETED THE SECOND WEEK OF NOVEMBER.

ANOTHER SECTION COMPLETED

THE MAIN EVENT ROOM IS TAKING SHAPE. FLOORING IS COMPLETE. CEILING TILES ARE GOING IN. SPRINKLER IS COMPLETE. A/C AND LIGHTING IS GOING IN

DOORS ARE BEING HUNG. ALL HAVE BEEN DELIVERED.

THE MULTI PURPOSE ROOM HAS BECOME THE SUPPLY ROOM. CEILING IS COMPLETE BUT FLOORING WILL BE THE LAST ONE COMPLETED.

THE TILE IN THE WOMENS RESTROOM IS COMPLETE

THIS WILL BE THE SINK AREA

THIS WILL BE THE HCP AREA

THE MEN CAME IN SECOND BUT IS BEING COMPLETED

THE PORCH CEILING HAS BEEN STARTED.

THIS SAME CEILING WILL BE IN THE LOUNGE AREA

THE PAVERS START MONDAY SO THE DECK AND PORCH WILL BE COMPLETED BY WEEKS END

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s